Alborzbar hormozgan
پروژه ها و سوابق اجرایی
26
December

Projects and executive backgrounds

پروژه ها و سوابق اجرایی
  1. Carrying out four turbine units from Bandar Abbas to Jam's refinery
  2. Transportation of 63 to 110 tons of 13 bogie units from Bandar Abbas to Marvdasht Petrochemical Company
  3. Transportation of bombs with 10 bogie units from Bandar Abbas to Shazand Arak refinery related to the construction company
  4.  Carrying two trans-200 tons from Bandar Abbas to Andisheh Power Transmission and 70 tons transloading from Bandar Abbas to Zahedan and carrying 9 generators with a weight of 70 to 110 tons from Bandar Abbas to Islamabad, West
  5. Related to the East Maham Group.
  6. Carrying out 4 bending machine units weighing 95 tons from Shahrud to Ahwaz and from Kawabandi to Ahwaz related to Khatam-ol-Anbia headquarters.
  7. Transportation of 8 consignments weighing 80 to 140 tons from Bandar Abbas to Shazand Arak Refinery.
  8. Carrying shipments of Sarouj-e-Bushehr cement factory weighing 70 tons to 140 tons to 114 piglets.
  9. Transportation of Yemen to 200 tons from Zanjan to Bandar Abbas.
  10. Transportation of 140 tons from Zanjan to Asalouyeh Sazeh Co.
  11. Delivery of Apadana Ceramic-Tile Tile Factory shipments from Bandar Abbas to 20 machines.
  12. Carrying a tank of 90 tons 35 meters long from Bandar Abbas to Shazand
  13. Transportation of two 27-meter tanks each weighing 100 tons of Karaj to Assaluyeh
  14. Transportation of heavy 80 tons to 150 tons of cement with 7 units
  15. Transportation of two trans-200 tons from Bandar Abbas to Jolfa, Maham East Company
  16. Carrying a project of the Mashhad city train from Bandar Abbas to Mashhad by 10 bogie units along with 100 crashing machines
  17. Transportation of two 200 ton transmissions from Khorramshahr to Behbahan related to Maham East Company
  18. Transportation of 19 tanks of Turkmenistan's Yolotan gas refinery by boogie
  19. 250 units of the equipment of Turkmenistan's Yolotan gas refinery were delivered by 250 machine guns
  20. Transportation of 140 ton tank from Bandar Abbas to Abhar
  21. Carrying wind turbine blades 45 meters long from Bandar Abbas to Khaf
  22. Transportation of tanks at Bandar Abbas refinery with a length of 18 meters, a height of 12 meters and a width of 18 meters with 20 axis of boogie
  23. Tunnel drilling equipment with a weight of 120 tons from Anzali to Qom
  24. Transit of 210 tons from Yazd to Bafgh and 140 tons from Bandar Abbas to Chenat
  25. Transportation of Lordean petrochemicals from 90 to 150 tons with a height of 7 meters by bogie
  26. Conveyance of Heavy Duty Congar / Uzbek Refinery Project (128 Crushing Machines and Approximately 27 Boogie Machines)
  27. Carrying out a turbine generator and generator, weighing 100 tons from Dubai to Kish Island
  28. 27. Transfer and transport of 200 tons of bogie on Hormozgan Steel Site
  29. 28.Transport cargo of 40 to 60 tons to Anzali Customs
  30. Transportation, transfer and unloading of 280 Ton Transformer by Boogie at Bandar Abbas Power Plant
  31. Carrying of rolling rolling equipment from Bandar Abbas to Isfahan Steel Co.
  32. Transportation of 20 meter long lorries by sliding truck from Bandar Abbas to Imam Khomeini port
  33. Transportation of 8 trailer and grader dumpers by Shamshkan from Bandar Abbas to Hasanrud Free Zone
  34. Transportation of 66 tons of lorries by Boogie from Bandar Abbas to Bandar Anzali
  35. Transportation of 130 tons of cargo by a boogie from Bandar Abbas to Bardsir
  36. Transportation and shipment of cargo of 170 tons by Boogie in Parsabad
  37. Handling, transferring and discharging a 60 ton transformer at the Jackdon Power Plant
  38. Container Container 520 Container Transport Equipment From Bandar Abbas to Bam
  39. Transportation of industrial equipment by 290 truck trucks from Bandar Abbas to Rafsanjan
  40. Carrying out of 140 tons of cranes from Anbar to Isfahan Steel Company by three bogie units and two crash-lifters.
  41. Carrying a circular drum machine weighing 55 tons from the port of Bandar Abbas to the exclusive customs of Isfahan Steel Co. by a bogie unit.
  42. A 150-ton press machine was shipped from Bandar Abbas to Ardakan, Yazd, by a bogie unit
  43. Transportation of 13 meters in length and 10 meters in width and 9 meters in height from Bandar Abbas to Khomein.
  44. Transportation of 82 containers of the construction and development company of MAPNA power plants from the port of Bandar Abbas to Sirjan.
  45. Transportation of Farab power plant equipment from Bandar Abbas to Dehgolan
  46. Transportation of road construction equipment of Zayan Road and Construction Company from Bandar Abbas to Anzali Customs.
  47. Container and Container Container Containers, Used by Trucks and Trucks, Yazd Alloy Steel Co.
  48. Transportation of Tom Iran Khodro Company's supplies from Bandar Abbas to Bardsir Kerman.
  49. Carrying on the equipment line for the Iranian Zarand Steel Plant by more than 1,500 trucks forklift trucks
  50. Carrying 140 container containers from Bandar Abbas to Saipa Kashan
  51. Carrying out the press and accessories of Ceram and Dorsa Ceram Company by Booghi, Kareshkan and Anfa from Bandar Abbas to Yazd
  52. Loading and carriage of 47 meters and accessories by bogies and lorries from the source of Bandar Abbas to the port of Amir Abad
Super User

15209 comments

Leave a comment

Make sure you enter the (*) required information where indicated. HTML code is not allowed.

a6c25404b279ee5069887eac43c34f6f.jpg
4d9e54305126f3530560f1fb20b83888.jpg
e48a9bedbed1e0bf516c7fb51b94a35d.jpg